What is PUE?

Power usage effectivenessReviewed

A data center with large rooftop cooling fans, fed by power lines from a distant tower.

Power usage effectiveness (PUE) is the standard measure of data center energy efficiency: the total energy a facility uses divided by the energy used by its IT equipment. A PUE of 1.0 would mean every kilowatt-hour reaches the servers, storage and network; a PUE of 1.5 means half as much again is spent on cooling, power conversion and lighting.

  • FormulaTotal facility energy ÷ IT energy
  • Introduced byThe Green Grid, 2007
  • StandardISO/IEC 30134-2
  • Ideal value1.0

01

What PUE does

PUE shows how much overhead a facility adds to its computing load. It is used to compare a site with itself over time, to set design targets for new halls, and increasingly in regulation and customer reporting.

Because it is a ratio, PUE moves with the weather, the season and the IT load: a half-empty hall usually has a worse PUE than a full one, because cooling and losses do not shrink in proportion.

Key functions

  • Tracks cooling and power-chain overhead
  • Compares a site against itself over time
  • Sets design targets for new capacity
  • Supports efficiency reporting
  • Pairs with WUE for water and CUE for carbon
  • Shows the effect of cooling changes

02

Why PUE matters

For a large facility, the gap between a PUE of 1.6 and 1.2 is a large share of the power bill and of the grid capacity the site needs. With power now the main limit on data center growth, overhead is capacity that cannot go to compute.

Reporting is also tightening. The EU’s Energy Efficiency Directive requires larger data centers to report energy performance including PUE, and customers increasingly ask for it in contracts.

03

How PUE works

PUE is calculated over a period, ideally a full year, as total facility energy divided by IT equipment energy. Total facility energy is measured at the utility meter. IT energy can be measured at different points: the UPS output, the PDU output or the IT equipment input; measuring closer to the equipment gives a more accurate and usually higher figure.

ISO/IEC 30134-2 defines these measurement categories so figures can be compared fairly. A PUE quoted without its period and measurement point is hard to interpret, and a single instantaneous reading can look much better than the annual figure.

  1. 01

    Utility meter

    Total facility energy

  2. 02

    Cooling and losses

    Overhead

  3. 03

    UPS, PDU or rack

    IT energy

  4. 04

    PUE

    Total ÷ IT over a period

04

How PUE feeds Voltra

Voltra models a data hall’s electrical chain from the utility service through UPS and PDU to each rack and reads server power over Redfish, so total facility power and IT power come from the same model and the same time base. Reports are built from those readings.

  • Learn more

    DCIM

    Utility-to-rack model, Redfish connector and reports.

  • Learn more

    EPMS

    Power monitoring from switchgear to rack.

05

Frequently asked questions

It depends on climate, design and load. Uptime Institute’s annual surveys have put the industry average at around 1.5 to 1.6 for several years, while new large facilities are often designed for 1.2 to 1.3 or lower.