Skip to content

Come see us at RE+ 2026Las Vegas, November 17–19 · Booth C7082, Central Hall

Read more about RE+ 2026 · Booth C7082
StudioPublic beta

Design, study and build a site on one model.

Single-lines, 3D, power studies, energy and finance, and the whole project, in one tool.

Sign up

Draw the single-line with the parts you will buy.

A single-line diagram from the PG&E 12 kV service through the 1,000 kVA transformer VRM-TX-1 and the 1,200 A switchboard VRM-MSB-1 to panels VRM-P-1 (400 A), VRM-P-2 (600 A, selected) and VRM-P-3 (225 A), which feed 24 L2 chargers, two DC chargers and a rooftop unit; the inspector shows VRM-P-2 rated 600 A, a Square D I-Line fed by VRM-MSB-1 and feeding VRM-DC-01–02.

See the site in 3D before anyone digs.

A 2.6-acre site plan on the map: the dashed site boundary around the depot building, measured at 212 ft, a carport, two rows of parking stalls and a keep-out zone.

Run the studies on the drawing, not a copy of it.

A short-circuit study on IEC 60909 with 20.9 kA at VRM-MSB-1: VRM-P-3 sees 11.2 kA against a 10 kA rating and is over rating, while VRM-MSB-1 (20.9 of 65 kA), VRM-P-1 (18.6 of 22 kA) and VRM-P-2 (17.4 of 22 kA) pass.

Then build it from the same model.

A schedule forecasting commercial operation on Sep 16, 2027: design done, permits and interconnection on track, the switchboard's long lead flagged to order by Nov 20, then install and commissioning, from October to October.

Ask the project. Let agents do the paperwork.

Agents propose changes and wait for a person to approve them.

Asked which gear still waits on submittals, Studio answers 2 items, each linked to its source: VRM-MSB-1 to SUB-022 and VRM-BESS-1 to SUB-025.

Ask

Answers come from the project's own records, each with its source.

3 agent proposals to review, each with an Approve action: chase RFI-014 with the vendor, log the decision to move the battery to pad 2, and a weekly digest.

Agents

They chase RFIs, write the weekly digest and keep the decision log.

A ready-for-IFC check with 2 blockers: the short-circuit study is out of date and SUB-025's approval is pending, while 38 design checks pass.

Skills

Is it ready for IFC? Write a test plan. Pick a design. One click each.

Everything in Studio.

From the first line on the map to the day the site goes live.

Single-line

  • AC and DC symbols, auto-wire and tidy
  • A one-line generated from the site map
  • Catalog parts with sourced ratings
  • Your own equipment library and typicals
  • 40+ checks with one-click fixes
  • Rule packs for NFPA 855, NEC 690.12 and 700–702
  • Three-line, riser, grounding and metering views
  • IEC and ANSI symbols
  • Colour by voltage, loading or fault level
  • Sheets and title blocks to PDF, SVG and DXF
  • Revisions, reviews and the engineer's seal
  • Comments and read-only share links
  • PSS/E, PVCollada, Revit and IFC in
  • A live as-built one-line from the running site

Site and 3D

  • Satellite map, address search, 2D and 3D drawing
  • Buildings with flat, hip and shed roofs
  • Roofs and footprints from Google Solar
  • Snap to roof edges in the imagery
  • Solar on roofs, carports and trackers
  • Sun, shadows and the buildings around you
  • Equipment in 3D with NEC working space
  • One pick across the map, one-line and lists
  • Floors, rooms and cutaway views
  • Battery, inverter, charger and pad-mount models
  • Trench and civil files to and from civil tools
  • Sites found by program rules
  • 3D terrain and every site on one map
  • A live twin of the running site

Power studies

  • Load flow and voltage drop
  • Short circuit to IEC 60909 and ANSI C37
  • Unbalanced LV, DC load flow and DC faults
  • Equipment duty to UL 489 and C37
  • Cable schedule to NEC 310.16 or IEC 60364
  • Service capacity to NEC 230.42 and 625.41
  • Load studies from metered history
  • Islanding, operating modes, load derating
  • Motor starting and harmonics to IEEE 519
  • N-1 and N-2 contingency, hosting capacity
  • IEEE 2800 at the POI, IEEE 80 grounding grids
  • MV cables to IEC 60287, and conduit fill

Energy and finance

  • An hourly year on 8 DOE building types
  • Solar, battery and EV charging from the design
  • Tariffs from URDB or your own
  • Battery dispatch against price and demand
  • Peak and demand charges, with and without storage
  • Savings, NPV, IRR, LCOE and payback over 25 years
  • ITC, MACRS and DSIRE incentives
  • Carbon and outage backup hours
  • What-if overlays and options side by side
  • Spare capacity found in Energy Insights bills
  • Earned value, S-curves and lender draws
  • Tax-credit evidence and upgrade cost shares

Build and hand over

  • Projects, sites, options and one published plan
  • Schedules from P6 and MS Project
  • Baselines, forecasts and slip alerts
  • Long-lead register, POs and design freeze
  • Hardware through Voltra: one quote, one invoice
  • A controls spec: gateways, interfaces, compute
  • Pre-built control panels shipped from the design
  • Interconnection queue tracker
  • Permit packets and inspections with photos
  • RFIs, submittals, decisions, risks and changes
  • Daily logs, monthly reports, 30/60/90 reviews
  • Commissioning, punch lists, MC to COD
  • Handover to Console, Maximo, MaintainX, Ignition
  • Portfolio rollups and search

Agents and AI

  • Ask the project, answered with its sources
  • Skills: pick a design, write a test plan, check readiness
  • Agents that chase RFIs and keep the decision log
  • Agents propose, people approve
  • A one-line from a brief, and autocomplete
  • Submittals checked against datasheets
  • Long-running agents across the EPC work
  • Your own agents, from templates
  • Bring your own model key

You make the calls. Studio does the legwork.

You decide

  • The brief, and which option to build
  • The design, sealed by your engineer of record
  • What agents propose, approved or not
  • Who builds it, and when the site goes live

Studio does

  • Draws, checks and studies the design
  • Runs the energy and finance case
  • Tracks the schedule, RFIs and interconnection
  • Hands the site to operations as a register

Calculated to the codes you design to.

Studies are checked against pandapower and OpenDSS, Simulate against PySAM and REopt.

  • NEC 2023Design checks
  • IEC 60909Short circuit
  • ANSI C37Fault duty
  • UL 489Breaker duty
  • NEC 310.16Cable ampacity
  • IEC 60364LV cables
  • NEC 110.26Working space
  • NEC 230.42Service capacity
  • NEC 625.41EV charging
  • IEEE 519Harmonics
  • IEEE 2800Inverters at the POI
  • IEEE 80Grounding
  • IEC 60287MV cables
  • NFPA 855Battery storage
  • NEC 690.12Rapid shutdown
  • NEC 700–702Emergency and standby

Real parts in, real files out.

  • Eaton
  • ABB
  • Schneider Electric
  • Siemens
  • GE Vernova
  • SEL
  • SMA
  • Tesla
  • Autel
  • Vertiv
  • Cummins
  • Generac
  • AutoCAD
  • Revit
  • Esri ArcGIS
  • Oracle
  • Microsoft Excel
  • IBM Maximo
  • Ignition
  • DXF
  • PDF
  • SVG
  • PSS/E
  • PVCollada
  • IFC
  • Primavera P6
  • MS Project
  • KML
  • GeoJSON
  • Shapefile
  • CSV
  • XLSX
  • Maximo
  • MaintainX
  • Ignition

Send us a site plan. We will model it with you.